Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

Jotun’s offshore coating system cuts maintenance intervals by 50 per cent

fiona by fiona
May 2, 2018
in Operations and Management
0
Jotun’s offshore coating system cuts maintenance intervals by 50 per cent

Jotun’s NORSOK approved offshore maintenance coating system for brush and roller application on power tooled and water jetted surfaces has gained approval for more than 20 different specifications with major asset owners, one year after its launch.

The system has been engineered specifically for offshore maintenance, whereas most solutions are designed and tested in accordance with the standard for new constructions. This means they are often designed for spray application and blast cleaned surfaces, rather than power tool cleaning and brush and roller application.

The solution claims to achieve 40% time savings on paint maintenance and 50% longer maintenance intervals than standard products for brush and roller application of power tooled and water jetted surfaces. It is a NORSOK compliant system 1 and is used by fabric maintenance contractors and asset owners to provide protection and durability.

According to Lasse Isaksen, Global Concept Director – Offshore, Jotun, this simple, efficient, and high-quality system greatly reduces costs for asset owners.

“In an industry, where maintenance costs for operating assets are up to 10-15 times higher than applying coatings in the yards, the fact that you can reduce the number of coats needed, while also extending the maintenance intervals, is a hugely compelling benefit for owners,” said Isaksen.

He continued: “Traditionally, contractors may have needed as much as five or six coats to achieve the required system build-up, but with the new maintenance system, the full build-up can be achieved by just one coat of each product, resulting in significant efficiencies.”

Jotun’s system is made up of a ceramically reinforced surface tolerant zinc rich epoxy, a high build surface tolerant epoxy primer and a one component polysiloxane topcoat. The system provides the same lifetime expectancy as a premium new building system intended for airless spray application.

 

Tags: Energy EfficiencyHull CoatingsJotunVessel maintenance
Previous Post

EfficienSea2 comes to an end

Next Post

LR to class first FSRU for Indian waters

Related Posts

Photo from Venergy Maritime.
Operations and Management

VENERGY Maritime doubles Hengli VLCC orders to four

November 9, 2026
OSM Thome’s Mary Joy Dela Cruz set out the four routines the company uses to build the people, processes and successors ashore. Photo from Digital Ship.
Operations and Management

How OSM Thome builds the shore team behind its crews amid a 39,100-officer shortfall

November 4, 2026
Photo from Synergy Marine Group.
Operations and Management

Synergy Marine adds dual-fuel LPG carrier as owners weigh long-term fuel choices

October 8, 2026
Photo from Port of Gothenburg.
Operations and Management

Stena Line’s 2031 Gothenburg terminal plan moves into design phase

October 8, 2026
Photo from Photo from HD Hyundai Heavy Industries.
Operations and Management

HD Hyundai’s lashing-free ship adds 10% deck capacity and cuts manual cargo work

October 7, 2026
Photo from One Network Express.
Operations and Management

ONE and ClassNK use vessel data to quantify roll damping on large container ships

October 6, 2026
Photo by Oleksiy Yeshtokyn,🌻🇺🇦🌻 from Pexels: https://www.pexels.com/photo/busy-shipping-port-with-container-ships-and-cranes-39362393/
Operations and Management

Laem Chabang expansion targets 18m TEU capacity as China and Thailand deepen port links

October 6, 2026
Photo from Lloyd’s Register.
Operations and Management

185,000 cbm LNG carrier design puts hybrid electric propulsion at the heart of LR, HHI and KSOE decarbonisation work

September 15, 2026
Photo from Bencros.
Operations and Management

Bencros puts 13,112 tonnes of verified CO₂ savings into marine fender procurement

August 30, 2026
Next Post
LR to class first FSRU for Indian waters

LR to class first FSRU for Indian waters

No Result
View All Result

Categories

  • Operations and Management
  • Propulsion and future fuels
  • Shipbuilding & Design
  • Technology
  • Regulation

VPO London Forum Showcase

https://vimeo.com/278105353?loop=0

vpo

Vessel Performance Info © 2024 | All Rights Reserved

More about Us

Topics We Cover

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group