Hamburg-based John T. Essberger has completed retrofit of a ballast water treatment system (BWTS) onboard its 34,500dwt bulk carrier, Zambesi.
The retrofit was carried out by Gibraltar-based Gibdock between June 4th and July 5th this year. Gibdock technicians carried out all the necessary pipework and preparations onboard, before assembling and installing the owner-supplied UV-type BWTS.
The shipyard worked alongside Aries Marine, a UAE-based specialist in ballast water treatment retrofit engineering, which supervised this element of the drydocking schedule.
Ship repair manager, Juan Piñero, said: “This was a complex retrofit, and our engineering staff and pipefitting team rose to the challenge magnificently and completed the works to the client’s complete satisfaction. With this project we have gained further valuable experience in ballast water treatment retrofits, which will hold us in good stead for the future, as a growing number of owners look to carry out this type of work to meet IMO requirements.”
The 2013-built, DNV GL classed vessel also underwent a number of repair and maintenance services , including a total of 2500m2 of blasting and painting on the vessel’s topside and underwater hull areas.
The vessel’s propeller was removed and refitted, seals were bonded, and the tailshaft and intermediate shaft were removed.
“This was a very demanding operation as it involved working in a very narrow space. Through careful preparation and planning, our engineers were able to carry out the necessary works successfully within the timescale required,” Piñero added.