Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

Canadian CG opts for SeaThigor seal for icebreaker retrofits

fiona by fiona
April 17, 2019
in Propulsion and future fuels
0
Canadian CG opts for SeaThigor seal for icebreaker retrofits
 The Thordon SeaThigor Seal

Thordon Bearings will provide the Canadian Coast Guard (CCG) with six SeaThigor shaft seals for retrofit to three purpose-built icebreakers.

CCG will retrofit its 5,910 GRT CCGS Pierre Radisson and sisterships CCGS Amundsen and CCGS Des Groseilliers, with two SeaThigor forward seals during scheduled dry-dockings over the next year.

SeaThigor is a seawater lubricated mechanical face seal. It has a safe return to port mode and is maintenance free to provide no visible or minimum leakage, long life and high operational reliability, and can withstand heavy-duty ice-breaking operations.

According to Scott Groves, Thordon Bearings’ regional manager – Americas, the vessels’ existing seals were leaking water into the machinery spaces, which meant they could not discharge oily-water overboard into Arctic waters.

The order, confirmed on the 1st of April, follows the success of the 2017 installation and subsequent operation of SeaThigor seals onboard the oceanographic and hydrographic survey vessel CCGS Hudson, for which a procurement agreement was signed with the Government of Canada under its Build in Canada Innovation Program (BCIP).

Due to the success of that first SeaThigor installation, the government permitted the Canadian Coast Guard (CCG) to deal directly with Thordon Bearings without either party having to go through a competitive bid process, via the BCIP – Additional Sales.

“This is a significant order for Thordon Bearings, marking not only the SeaThigor seal’s first-ever reference onboard a purpose-built icebreaker but also the largest propeller shaft seals we have ever manufactured,” said Scott Groves.

The 98.2m (322ft) long, 1200-class vessels are designed to Arctic Class 3 requirements and operate twin 674mm (26.5in) diameter shafts driving fixed pitch propellers. Propulsive power is generated by six Alco M251F main engines delivering 10142kW of power.

The seals supplied to the Pierre Radisson-class of ships will also be the first SeaThigors designed with a split casing.

“The limited space available in the vessels’ engine room prevented the installation of a SeaThigor seal with a conventional, fully encased bronze housing. So, we designed a seal with a split casing to simplify the installation and commissioning process, allowing engineers to access the underside of the seal. Many different departments – procurement, design, engineering and manufacturing – came together to really make this happen. It was a complete team effort,” said Jasmin Racicot, from Thordon Distributor RMH Industries.

Tags: Canadian Coast GuardSustainable ShippingThordon Bearings
Previous Post

Wallem CEO sets out strategy for change

Next Post

Pragmatism should drive the adoption of digital agendas

Related Posts

Photo from Hapag-Lloyd.
Propulsion and future fuels

Hapag-Lloyd and Goldwind put 250,000-tonne biomethanol supply plan into operation

October 6, 2026
Photo from P4I.
Propulsion and future fuels

Malaysia cuts green bunkering approvals from eight agencies to one

October 5, 2026
Photo from International Chamber of Shipping (ICS).
Propulsion and future fuels

100+ ships now use wind-assisted propulsion as MOL and industry leaders push commercial adoption

October 5, 2026
Photo from Accelleron.
Propulsion and future fuels

Accelleron gets ClassNK certification for 3,000-vessel engine and emissions data platform

October 2, 2026
Photo from Siemens Energy.
Propulsion and future fuels

20 MWh electric-ready CSOV brings battery scaling to offshore wind

October 2, 2026
Photo from CMA CGM.
Propulsion and future fuels

CMA CGM cuts carbon intensity 58% as AI enters next phase of fleet decarbonisation

October 1, 2026
Photo from RAD.
Propulsion and future fuels

RAD puts £995 monthly lease behind electric boat propulsion

October 1, 2026
Photo from Maersk.
Propulsion and future fuels

Maersk bunkers Tangier Maersk with 100% US corn ethanol

September 30, 2026
Photo by U.Lucas Dubé-Cantin from Pexels: https://www.pexels.com/photo/silo-in-harbor-8527740/
Propulsion and future fuels

MidOcean backs 28 mtpa LNG Canada expansion in lower-carbon energy strategy

September 30, 2026
Next Post
Pragmatism should drive the adoption of digital agendas

Pragmatism should drive the adoption of digital agendas

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group