Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

Sapura Brazil signs optimised maintenance agreement with Wärtsilä

fiona by fiona
July 8, 2019
in Operations and Management
0
Sapura Brazil signs optimised maintenance agreement with Wärtsilä
Sapura Brazil’s six PLSVs will benefit from Wärtsilä’s optimised maintenance solution. Image courtesy of Sapura Navegação Maritima

Wärtsilä has signed a five-year optimised maintenance agreement with Sapura Brazil, a company specialised in sub-sea services.

The agreement, signed in June 2019, covers Sapura’s fleet of six pipe-laying support vessels (PLSVs). The agreement will support the fleet’s operational performance and increase both its efficiency and reliability by accurately predicting maintenance requirements, while also lowering operating costs.

The Wärtsilä solution includes asset diagnostics of the vessels’ main engines and thrusters to define the actual condition of the equipment. This enables a predictive maintenance strategy whereby servicing activities and overhauls are carried out according to the known condition of the equipment components, rather than on fixed scheduled intervals. Wärtsilä’s Dynamic Maintenance Planning (DMP) solution thus optimises the time between major maintenance work and increases the efficiency of the vessels’ operations. By reducing both scheduled and unscheduled downtime, greater utilisation of the vessels will also be achieved.

“This project further tightens our relationship with Wärtsilä and will deliver significant benefits to our operations. It is important to have this type of preparedness, which is focused on prevention, since it allows us to feel more confident about the integrity and reliability of our equipment,” commented Rogério Salbego, CEO of Sapura Brazil.

“This agreement provides the customer with the benefits of the extensive experience and know-how we have, plus the latest predictive analytics technology. Wärtsilä is able to accurately analyse the need for maintenance on the ships’ engines and thrusters, and with our class-approved DMP concept we can achieve the flexibility and cost savings not possible with conventional manual-based maintenance planning. The necessary work and spare part requirements can be efficiently planned and scheduled in accordance with the Sapura vessels’ utilisation demand, and based on the true condition of the propulsion equipment,” said André Bosman, director, Business and Operations Support, Wärtsilä Marine.

As part of the agreement, Sapura Brazil will have access to the Wärtsilä Expertise Centres to obtain full technical support for its operations. The ships covered by the agreement are fitted with Wärtsilä 32 engines and Wärtsilä transverse, steerable and retractable thrusters.

Tags: MaintenanceSapura BrazilWärtsilä
Previous Post

Chugoku Marine Paints expands Selektope-containing antifouling range

Next Post

Singapore issues guidance to help industry prepare for IMO 2020

Related Posts

Photo from Venergy Maritime.
Operations and Management

VENERGY Maritime doubles Hengli VLCC orders to four

November 9, 2026
OSM Thome’s Mary Joy Dela Cruz set out the four routines the company uses to build the people, processes and successors ashore. Photo from Digital Ship.
Operations and Management

How OSM Thome builds the shore team behind its crews amid a 39,100-officer shortfall

November 4, 2026
Photo from Synergy Marine Group.
Operations and Management

Synergy Marine adds dual-fuel LPG carrier as owners weigh long-term fuel choices

October 8, 2026
Photo from Port of Gothenburg.
Operations and Management

Stena Line’s 2031 Gothenburg terminal plan moves into design phase

October 8, 2026
Photo from Photo from HD Hyundai Heavy Industries.
Operations and Management

HD Hyundai’s lashing-free ship adds 10% deck capacity and cuts manual cargo work

October 7, 2026
Photo from One Network Express.
Operations and Management

ONE and ClassNK use vessel data to quantify roll damping on large container ships

October 6, 2026
Photo by Oleksiy Yeshtokyn,🌻🇺🇦🌻 from Pexels: https://www.pexels.com/photo/busy-shipping-port-with-container-ships-and-cranes-39362393/
Operations and Management

Laem Chabang expansion targets 18m TEU capacity as China and Thailand deepen port links

October 6, 2026
Photo from Lloyd’s Register.
Operations and Management

185,000 cbm LNG carrier design puts hybrid electric propulsion at the heart of LR, HHI and KSOE decarbonisation work

September 15, 2026
Photo from Bencros.
Operations and Management

Bencros puts 13,112 tonnes of verified CO₂ savings into marine fender procurement

August 30, 2026
Next Post
Singapore issues guidance to help industry prepare for IMO 2020

Singapore issues guidance to help industry prepare for IMO 2020

No Result
View All Result

Categories

  • Operations and Management
  • Propulsion and future fuels
  • Shipbuilding & Design
  • Technology
  • Regulation

VPO London Forum Showcase

https://vimeo.com/278105353?loop=0

vpo

Vessel Performance Info © 2024 | All Rights Reserved

More about Us

Topics We Cover

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group