Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

ClassNK releases guideline for LNG bunkering vessels

fiona by fiona
January 4, 2021
in Operations and Management
0
ClassNK releases guideline for LNG bunkering vessels

ClassNK has released its Guideline for Survey and Facilities/Equipment of LNG Bunkering Ships, which outline the additional safety requirements of liquefied gas carriers that supply LNG fuel at sea.

The number of LNG-fuelled ships has been increasing in recent years as their CO2, SOx, and NOx emissions have a lower environmental load compared to ships that use conventional oil fuels. On the other hand, the facilities that supply LNG as fuel from quay facilities to general ships are still limited. Liquefied gas carriers supplying LNG fuel at sea are considered candidates for ensuring variations in fuel supply, and more liquefied gas carriers (LNG bunkering ships) that supply LNG to ships are also being built and operated.

There are currently no established international conventions for the facilities/equipment of ships that transfer LNG to other ships at sea, and additional safety equipment has been considered individually. Based on the examinations conducted so far, ClassNK has developed the Guideline which compiles the requirements for additional equipment for the safe transfer of LNG, a cryogenic substance, between ships, and surveys. The Guideline stipulates the layout and system design of LNG bunkering ships, fuel transfer systems, and operation, as well as class notations according to the equipment to be installed.

The Guideline are available to download free of charge via ClassNK’s website www.classnk.com for those who have registered for the ClassNK “My Page” service. To register for the “My Page” service, go to the ClassNK website and click on the “My Page Login” button.

Tags: BunkeringClassNKLNG
Previous Post

Improving port call efficiency through digital collaboration

Next Post

Royston completes engine overhauls on Mainport vessel

Related Posts

OSM Thome’s Mary Joy Dela Cruz set out the four routines the company uses to build the people, processes and successors ashore. Photo from Digital Ship.
Operations and Management

How OSM Thome builds the shore team behind its crews amid a 39,100-officer shortfall

November 4, 2026
Photo from Synergy Marine Group.
Operations and Management

Synergy Marine adds dual-fuel LPG carrier as owners weigh long-term fuel choices

October 8, 2026
Photo from Port of Gothenburg.
Operations and Management

Stena Line’s 2031 Gothenburg terminal plan moves into design phase

October 8, 2026
Photo from Photo from HD Hyundai Heavy Industries.
Operations and Management

HD Hyundai’s lashing-free ship adds 10% deck capacity and cuts manual cargo work

October 7, 2026
Photo from One Network Express.
Operations and Management

ONE and ClassNK use vessel data to quantify roll damping on large container ships

October 6, 2026
Photo by Oleksiy Yeshtokyn,🌻🇺🇦🌻 from Pexels: https://www.pexels.com/photo/busy-shipping-port-with-container-ships-and-cranes-39362393/
Operations and Management

Laem Chabang expansion targets 18m TEU capacity as China and Thailand deepen port links

October 6, 2026
Photo from Lloyd’s Register.
Operations and Management

185,000 cbm LNG carrier design puts hybrid electric propulsion at the heart of LR, HHI and KSOE decarbonisation work

September 15, 2026
Photo from Bencros.
Operations and Management

Bencros puts 13,112 tonnes of verified CO₂ savings into marine fender procurement

August 30, 2026
Photo from MacGregor.
Operations and Management

MacGregor’s 79% proven LCO₂ transfer system targets direct offshore carbon injection

August 25, 2026
Next Post
Royston completes engine overhauls on Mainport vessel

Royston completes engine overhauls on Mainport vessel

No Result
View All Result

Categories

  • Operations and Management
  • Propulsion and future fuels
  • Shipbuilding & Design
  • Technology
  • Regulation

VPO London Forum Showcase

https://vimeo.com/278105353?loop=0

vpo

Vessel Performance Info © 2024 | All Rights Reserved

More about Us

Topics We Cover

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group