Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

Marine Service and Newport Shipping secure BV AiP for containerised LNG solution

fiona by fiona
March 15, 2022
in Operations and Management
0
Marine Service and Newport Shipping secure BV AiP for containerised LNG solution

Marine Service and Newport Shipping have announced an approval in principle (AiP) from Bureau Veritas (BV) for a jointly developed containerised LNG solution.

The 40′ ISO LNG Fuel Tank Container System is suitable for LNG-fuelled newbuildings and retrofits of container vessels.

The LNG fuel tank container is a class approved Type C LNG fuel tank in accordance with the IGF-code and is based on German TÜV certified IMDG Container. The capacity of the tank is 31 gross tonnes and about 33m3 of LNG. The containers have a fail-safe dry quick coupling connection and are approved for loading in up to 7 layers high stacks. The stainless-steel double-walled tank is also vacuum insulated and has up to 80 days holding time.

The concept consists of container stowage on free deck in safe area. LNG piping and venting system as well as firefighting systems are integrated in the container cell guides structure. The gas handling room is arranged adjacent to the container storage and separated from the containers by a cofferdam and fire protection means, allowing to feed low pressure and high pressure fuel gas systems for all known 4-stroke and two-stroke dual fuel engines. A full redundant control, alarm & monitoring system for remote system operation, gas and fire alarm with interface to ships’ automation is part of the system.

Since LNG containers are portable, the total number of containers can be easily optimised according to the owners’ requirements. Simple and easy to install on board, when a ship is in port, the empty containers can be taken out and replaced by new filled ones.

“The global shipping industry faces unprecedented challenges as environmental regulations tighten. The shipping industry needs alternatives. The containerised LNG concept provides an answer to these challenges,” said Ingmar Loges, managing director, Newport Shipping.

Marine Service develops several LNG fuel solutions including tank containers. The containers are an alternative solution to traditional LNG bunkering.

Newport Shipping offers its customers full retrofit services for Marine Service’s LNG fuel tank container solutions at its 15 yards that it works in cooperation with. With flexible financing options and a quick delivery of turnkey LNG retrofit options the company expects that this will present itself an attractive option for clients in the near future.

“We are glad to have reached an Approval in Principle from BV for our containerised LNG as fuel solution. LNG is one of the most promising alternative fuels by now,” said Christian Krämer, chairman of Marine Service.

Tags: Approval in PrincipleAutomationBureau VeritasContainershipsdual-fuel enginesJoint Development ProjectLNGMarine Service CompanyNewbuildsNewport ShippingRetrofits
Previous Post

Chris-Marine launches shaft power limitation solution for EEXI compliance

Next Post

Tidewater signs fleetwide maintenance deal with Tero Marine

Related Posts

Photo from One Network Express.
Operations and Management

ONE and ClassNK use vessel data to quantify roll damping on large container ships

October 6, 2026
Photo by Oleksiy Yeshtokyn,🌻🇺🇦🌻 from Pexels: https://www.pexels.com/photo/busy-shipping-port-with-container-ships-and-cranes-39362393/
Operations and Management

Laem Chabang expansion targets 18m TEU capacity as China and Thailand deepen port links

October 6, 2026
Photo from Lloyd’s Register.
Operations and Management

185,000 cbm LNG carrier design puts hybrid electric propulsion at the heart of LR, HHI and KSOE decarbonisation work

September 15, 2026
Photo from Bencros.
Operations and Management

Bencros puts 13,112 tonnes of verified CO₂ savings into marine fender procurement

August 30, 2026
Photo from MacGregor.
Operations and Management

MacGregor’s 79% proven LCO₂ transfer system targets direct offshore carbon injection

August 25, 2026
Photo from Portchain.
Operations and Management

200 terminals, six carriers: X-Press Feeders and Portchain on lower emissions through digital berth planning

August 18, 2026
Photo from CGM.
Operations and Management

CMA CGM and Stonepeak launch ports venture with US$6 billion decarbonisation investment capacity

July 29, 2026
Photo from Uni-Tankers.
Operations and Management

Uni-Tankers targets 50% carbon intensity cut by 2030 with data-led climate transition plan

July 23, 2026
Photo from MACS.
Operations and Management

53 industry experts back new procurement toolkit to cut plastic use before it reaches ships

July 16, 2026
Next Post
Tidewater signs fleetwide maintenance deal with Tero Marine

Tidewater signs fleetwide maintenance deal with Tero Marine

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group