Shipping company Neoline is to equip its latest vessel, a 136-meter wind-powered merchant ship, with a Solid Sail solution from Chantiers de l’Atlantique to slash fuel consumption.
The cargo ship, the construction of which is scheduled to begin this year and to enter into service in 2024-2025, will save 80 to 90 per cent of fuel compared to a conventional ship of the same size.
Following technical studies carried out by Chantiers de l’Atlantique, Neopolia, Mauric and D-Ice, the ship’s rigging will consist of two Solid Sail folding rigging systems, including two masts of 76 m in height, each equipped with the Solid Sail sail technology of 1,100 m² and a flexible jib of 400 m², with a total sail area of 3,000 m².
Obtained calculations show that the Solid Sail rig, with its rigid sails, will provide the equivalent or even better performance than the 4,200 m² of flexible sails initially planned for the duplex rig, thanks to the thinness and vertical elongation of the structure, as well as the reduction of the masking effect of the sails.
The expected lifetime of the sail is 25 years, which will reduce maintenance costs compared to soft sails. The production and installation of this innovative rigging by Chantiers de l’Atlantique on the hull of the Neoliner will boost the local economy and occupy many trades at different stages.
“The expertise of our technical partners and local players, combined with Chantiers de l’Atlantique’s research and development, give the project a synergy of skills, which made this choice possible. The continuous work on the general design of the ship over the last few months by Mauric, Neoliner’s architect, has enabled the architecture to be adapted to this new rig, in order to ensure its integration on board. The studies have confirmed the technical feasibility of the major evolution of the rig, both from a structural and stability point of view and in terms of the general organisation of the ship” said Jean Zanuttini, president of Neoline.
A crowdfunding campaign was launched in January 2022 to support the project and will remain active until June 12, 2022, on the WiSEED platform. EUR 1 million is sought for this crowdfunding collection, which is part of the fundraising of EUR 3.3million from financial investors. EUR 700 000 have already been raised and more than 800 people have already mobilised.










