Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

P&O Maritime Logistics announce plan to convert MCV into CLV

Tabitha Wilson by Tabitha Wilson
December 3, 2024
in Shipbuilding & Design
0
P&O Maritime Logistics announce plan to convert MCV into CLV

P&O Maritime Logistics have announced plans to convert one of its Multi-Carrying Vessels (MCV’s) into a Cable-Laying Vessel (CLV). Powered by alternative energy, the vessel will be the first of its kind within the company’s expanding portfolio of specialised offshore products and services.

Image Credit: P&O Maritime Logistics

Set to start operations in the third quarter of 2024, the conversion aligns with P&O Maritime Logistics’ commitment to decarbonisation. The company’s newly converted vessel will be equipped with a state-of-the-art battery system, as well as a low-fuel consumption propulsion layout for green methanol fuel.

The new CLV will give P&O Maritime Logistics’ customers the ability to connect offshore structures and bring offshore energy onshore by installing export and inner array cables across vast distances. The company expects that one of the main uses of the vessel will be to connect offshore wind farms with the mainland.

CEO of P&O Maritime Logistics, Martin Helweg, stated: “The conversion of our vessel is a real step change. It means, apart from expanding our existing services and products into a more specialised offering, that we can also make a positive contribution to the decarbonisation of our industry. One way of doing this is by using alternative energy to power the converted vessel. The other important contribution is that the Cable Laying Vessel will predominately support the construction, development, and maintenance of existing and prospective wind farms. Lastly, and by repurposing an existing vessel, we are able to extend the lifetime of this particular product quite significantly to keep up with the increasing demand in the sector.”

Talking about the conversion, Project Manager at C-Job Naval Architects, Marc van der Zwaluw, commented: “We are pleased to support P&O Maritime Logistics with the design of a cable-laying vessel by repurposing an existing module carrier vessel. With the increasing demand in the offshore wind sector, this vessel will be able to meet the operational demands for the installation of next-generation windmill infrastructure thanks to its optimised deck layout. Furthermore, in close cooperation with P&O Maritime Logistics, we were able to create a design that was best suited to their operational profile. The design focused on optimised vessel performance and features a DP-2 positioning system and a low fuel consumption propulsion layout that is ready for green methanol fuel and zero emission operations.”

The conversion expands on the company’s recent success in Taiwan with the Topaz Installer. The newly converted vessel will have the ability to host up to 64 seafarers and features a single basket cable carousel with an outside diameter of 24 meters.

Tags: Alternative EnergyCable Laying VesselCLVDecarbonisationGreen methanol fuelMCVMulti Carrying VesselOffshore Wind FarmsP&OP&O Maritime Logistics
Previous Post

ONE announces successful completion of biofuel trial

Next Post

Small propeller defects lead to increased noise pollution

Related Posts

Photo from Wärtsilä.
Shipbuilding & Design

TMS Cardiff Gas signs five-year Wärtsilä deal for two new LNG carriers

October 8, 2026
Photo from Seaspan.
Shipbuilding & Design

Seaspan and Maersk invest US $75m in 18-vessel retrofit programme to cut emissions and improve efficiency

July 8, 2026
Photo from ClassNK.
Shipbuilding & Design

ClassNK claims world’s first ship construction carbon footprint notation to support Scope 3 reporting

July 2, 2026
Photo from WinGD.
Shipbuilding & Design

Dynacom orders 12 VLCCs with WinGD engines as fleet renewal targets efficiency and emissions compliance

July 2, 2026
Photo from Grimaldi Group.
Shipbuilding & Design

Grimaldi orders batteries for nine RoPax vessels in methanol-ready fleet renewal

July 1, 2026
Photo from Vard.
Shipbuilding & Design

VARD delivers hybrid cable layer with battery-powered energy system to cut emissions for Toyo Construction

June 29, 2026
Photo from OSM.
Shipbuilding & Design

OSM Thome oversees construction of cable-layer claimed to be Asia’s largest for LS Marine Solution

June 22, 2026
Photo from Bureau Veritas.
Shipbuilding & Design

Bureau Veritas and Hudong-Zhonghua begin construction of 271,000 cbm LNG carrier with 57% more cargo capacity

June 19, 2026
Photo from Hyundai Glovis.
Shipbuilding & Design

Seaspan delivers 10,800-CEU LNG car carrier with 24% lower emissions under Hyundai Glovis charter

June 12, 2026
Next Post
Small propeller defects lead to increased noise pollution

Small propeller defects lead to increased noise pollution

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group