Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027
No Result
View All Result
Vessel Performance Information
No Result
View All Result

ABB shaft generator on 30 LNG carriers

Farah Ribbens by Farah Ribbens
February 26, 2025
in Shipbuilding & Design
0
ABB has secured orders from shipbuilders in China and South Korea to equip 18 and 12 liquified natural gas (LNG) carriers respectively with permanent magnet shaft generator technology. The ships are due for delivery between 2028 and 2030.

Enhancing operational efficiency by utilizing the power from the main engine, ABB’s permanent magnet shaft generator system improves fuel economy compared to solutions where power is provided by auxiliary engines. By avoiding starting up high-speed fuel intensive auxiliary engines during a voyage, ship operators can achieve significantly greater fuel efficiency. In addition, the permanent magnet shaft generator solution provides better efficiency than either induction or electrically excited synchronous machines, at full and partial load.

According to ABB’s estimation, the company’s permanent magnet shaft generator system can cut fuel costs by up to four percent compared to conventional solutions. When combined with ABB’s advanced ACS880 Converter and Control System, which ensures maximum flexibility and functionality in hybrid applications, the technology can increase fuel efficiency by a further one percent.

By eliminating the excitation unit inside the converter, combined with the compact size of the permanent magnet shaft generator, the system has the potential to deliver up to 20 percent space and weight savings, while its simple design helps to reduce installation and maintenance costs. These gains make a significant difference for ship owners working to increase their competitive advantage in alignment with the International Maritime Organization’s decarbonization targets.

“We are proud to win the largest ever combined orders for our permanent magnet shaft generator systems, with LNG carrier deliveries set for multiple AMEA owners from shipbuilders in China and South Korea,” said Michael Christensen, Global Segment Responsible for Cargo Vessels, ABB Marine & Ports. “These agreements include first-time customers for the permanent magnet shaft generator system, further confirming its benefits across a wide scope of cargo vessel types to serve shipping’s need for the enhanced fuel efficiency that reduces operating costs and helps them to meet decarbonization requirements.”

Previous Post

Norsepower (sails) and Syroco (software) collaborate to improve wind propulsion efficiency

Next Post

Lighthouse Ship Management reduces fuel costs on coaster vessel 33 per cent with BERG Propulsion retrofit

Related Posts

Photo from Wärtsilä.
Shipbuilding & Design

TMS Cardiff Gas signs five-year Wärtsilä deal for two new LNG carriers

October 8, 2026
Photo from Seaspan.
Shipbuilding & Design

Seaspan and Maersk invest US $75m in 18-vessel retrofit programme to cut emissions and improve efficiency

July 8, 2026
Photo from ClassNK.
Shipbuilding & Design

ClassNK claims world’s first ship construction carbon footprint notation to support Scope 3 reporting

July 2, 2026
Photo from WinGD.
Shipbuilding & Design

Dynacom orders 12 VLCCs with WinGD engines as fleet renewal targets efficiency and emissions compliance

July 2, 2026
Photo from Grimaldi Group.
Shipbuilding & Design

Grimaldi orders batteries for nine RoPax vessels in methanol-ready fleet renewal

July 1, 2026
Photo from Vard.
Shipbuilding & Design

VARD delivers hybrid cable layer with battery-powered energy system to cut emissions for Toyo Construction

June 29, 2026
Photo from OSM.
Shipbuilding & Design

OSM Thome oversees construction of cable-layer claimed to be Asia’s largest for LS Marine Solution

June 22, 2026
Photo from Bureau Veritas.
Shipbuilding & Design

Bureau Veritas and Hudong-Zhonghua begin construction of 271,000 cbm LNG carrier with 57% more cargo capacity

June 19, 2026
Photo from Hyundai Glovis.
Shipbuilding & Design

Seaspan delivers 10,800-CEU LNG car carrier with 24% lower emissions under Hyundai Glovis charter

June 12, 2026
Next Post
Lighthouse Ship Management reduces fuel costs on coaster vessel 33 per cent with BERG Propulsion retrofit

Lighthouse Ship Management reduces fuel costs on coaster vessel 33 per cent with BERG Propulsion retrofit

No Result
View All Result
  • Read
    • Propulsion and future fuels
    • Operations and Management
    • Shipbuilding & Design
    • Maintenance & Continuous Improvement
    • Regulation
    • Technology
  • Subscribe for Free
  • Summit 2027

© 2025 Vessel Performance Information, part of Antares Digital Group